Quote the job before
the other firm rings back.
Six taps on your phone from the van. ScaffQuote prices the job on your rates, runs a TG20:21 check, and sends a branded PDF your client can sign, in the time it takes to drink a brew.
The demo prices a real job in about a minute. Nothing to sign up for, and you can save it to an account afterwards.
- TG20:21-aware
- GDPR · UK-hosted
- No card to try
- Built with UK scaffolders

Bays
5
Lifts
3
Snap the front of the building, we drop the scaffold in. Tap bays or lifts to tweak.
"Roofer rings you Monday morning. Three sides of a semi, re-roof, wants a price today. You're already on another job. By the time you've measured up and typed it out that night, he's had two other quotes. You never even got to bid."
You lose jobs to whoever quotes first
Take 3 days to price it up in Word and the builder's already had two other numbers.
You quote at 9pm at the kitchen table
Home from site at 6, dinner, then two hours pricing when you should be with the family.
TG20 paperwork gets skipped
Every job needs a sheet. Half get done. Then HSE turn up and it's your name on the door.
Built with scaffolders, not just for them
I'm Ade. I build software, and I've spent the last year sat with UK scaffolders working out how they actually price a job. ScaffQuote is what came out of it. Quotes, TG20:21 sheets and branded PDFs, done from the van in about four minutes.
Three steps. Phone in one hand, brew in the other.
Snap & describe
Take a photo on site. Tell ScaffQuote the run length, lifts, boards wide, duration and access type. Six fields, that's it.
Instant quote in seconds
Line items, day rates, hire periods and adjustments, all priced from your own rate card. Tweak anything you like before it goes out.
Send branded PDF + TG20 sheet
One click: quote and compliance pack emailed to the client with your logo, insurance details and CISRS numbers attached.
Real claims, no invented testimonials.
We don't yet have enough verified customer feedback to publish named reviews. Until we do, we'll only show what we can prove.
Already helping UK scaffolders quote faster
Used by early adopters around the country
TG20:21 compliance sheet with every quote
Help us earn the proof.
If you try ScaffQuote and it saves you time, leave an honest review on Trustpilot. We read every one and it helps other firms decide.
Built in the UK by Ade.
ScaffQuote is run from Barking, Essex. I'm always happy to talk through how it fits your firm before you sign up.
Built around NASC TG20:21, by scaffolders, for scaffolders.
ScaffQuote knows the compliant configurations: tie patterns, bay lengths, lift heights, board widths, sheeting and netting loads. If your inputs sit outside TG20 compliance, it flags it and tells you what to change, or when you need a bespoke design.
- TG20:21 compliant config check on every quote
- Auto-generated compliance sheet PDF, branded with your firm
- CISRS numbers, insurance and SSIP details auto-attached
- All quotes archived, pull any job back up in seconds
Flat price per firm. Win one extra job and it's paid for the year.
Start free, no card. Upgrade when it's already winning you work. Monthly rolling, cancel any time.
Starter
Try the full flow, free.
- Up to 3 quotes / month
- Branded PDF + TG20:21 sheet
- 1 user
- No card needed
Pro
For working scaffolders.
- Unlimited quotes + TG20 sheets
- Your rate card, your branding
- Client e-sign + follow-ups
- Up to 3 users
- WhatsApp line to the founder
Crew
For busier yards.
- Everything in Pro
- Unlimited users
- Multiple rate cards
- Priority support
A single small job is ~£1–2k. Pro pays for itself the first time you win one you'd have lost.
Not ready to sign up? Try the live quote demo , no account needed.
Straight answers.
Will the quotes actually look like mine?+
Yes. We onboard your logo, insurance, CISRS card numbers and your own rate card. Every PDF goes out looking like you wrote it.
Is the TG20 sheet good enough for the HSE / NASC?+
It mirrors the NASC TG20:21 guidance. If your inputs fall outside TG20 compliant configurations, we tell you, and flag where you'd need a bespoke design instead.
Do I need to be techy?+
If you can use WhatsApp, you can use ScaffQuote. Setup is automatic: add your company details, upload your logo, and your first quote is ready in minutes. Message us on WhatsApp at 07871581352 if you get stuck.
What if I don't like it?+
Cancel any time inside the 7-day trial, no card charged. After that, monthly rolling. No 12-month contracts.
Free guides for quoting and compliance.
Business
Start a scaffolding business
Legal structure, insurance, CISRS cards, kit costs and first customers.
Read the guide →Business
How to get scaffolding contracts
Tenders, frameworks, main contractor lists, free leads and staffing the work.
Read the guide →Pricing
How to price a scaffolding job
Per-metre rates, lifts, transport, hire periods, with a full worked example.
Read the guide →Compliance
TG20:21 compliance guide
Tie patterns, load classes and the site checks that keep inspectors happy.
Read the guide →Get your evenings back.
Sign up free and quote your next job in under 4 minutes. No card needed, your first 3 quotes are on us every month.
Generate My First Quote →Free Starter tier. Upgrade only when it's already winning you work.
